The top and the footing of the wall have been covered with a material called Blueskirt. |
The lone pine planter has been cast and its interior covered with protective material. |
Note the hole and the structure. There will be a lot going on with this structure. It will have a power supply and facilities involving water, most likely for the tree that will go in it. |
The top of the manhole cover will eventually be the ground level. The rectangular thing in front of the manhole cover will be an access cover for water supply. |
A demonstration of how the wall will be covered. |
The rebar structures will go on the leveled pathway, which will have a concrete surface that will be covered with stone work. |
There's the test wall covering with a capstone for the wall. |
You can see stones on the surface behind the capstone. |
This is a heavy duty bag for carrying things around on the site. |