There will be a light fixture on this hard point. Note the bolts sticking up. |
There is a tarp on the structure for the statue base. This is likely in preparation for winter. |
Stones are being laid on the concrete structures on the north slope. There will be much work done with all of this. |
Note the small cement mixer. There are two of these on the site. The concrete made with them is used as mortar for the stone work on the north slope. |